New construction is the one place a per-square-foot number is genuinely useful โ€” as long as you know what it excludes.

Elusive Construction · CA General B #1112902 · Updated 2026-08-10

Home  /  New Construction Costs
Short answer

Ground-up new construction in San Jose starts around $500 per square foot, plus site work and soft costs. That rate describes new construction specifically — it is not the right number for an ADU, an addition or a remodel.

Why $500/sq ft only describes new construction

It is a common and expensive mistake to apply one rate across every kind of project. New construction, ADUs, additions and gut remodels have genuinely different cost structures. An ADU carries fixed soft costs that don't scale. A remodel carries demolition and the risk of what's behind the walls. New construction is the one case where the building is the dominant cost and the rate behaves predictably.

What sits outside the per-square-foot number

Costs that are separate from the build rate
ItemWhy it's separate
The landObviously โ€” but worth stating, because it dwarfs everything else here
Demolition of what's there nowDepends entirely on what is being removed
Geotechnical and site conditionsSlope, drainage, liquefaction and access can change the foundation design substantially
Utility connectionsDistance to service, and whether the street has capacity
Permits, impact and school feesSet by the jurisdiction, pulled per job
Design and engineeringA full permit set including Title 24

The site is what decides whether a lot pencils

Two lots the same size, the same zoning, and the same house on paper can be a hundred thousand dollars apart once the site is real. Slope means grading, retaining and drainage. Poor soils mean a deeper or engineered foundation. A narrow or landlocked lot means material and spoil move slowly, and labour is time.

Get the soils report before you commit, not after

It is the single highest-leverage thing you can pay for early. It determines the foundation design, which is the largest swing factor in the whole budget, and it is far cheaper than discovering the answer during construction.

Timeline

Design and engineering, then plan check, then construction. The permitting phase is the one people underestimate, and it varies by jurisdiction more than anything else in the process. We ask each city directly rather than assuming, because guessing a plan-check timeline is how a schedule promise becomes a broken one.

This is our lead trade

New construction is the work we are built around — not a remodeling company that occasionally takes a ground-up job. What new construction with us looks like →

Common questions

How much does it cost to build a house in San Jose?
Ground-up new construction starts around $500 per square foot, plus site work, permits and soft costs. Land is separate.
Does $500 per square foot include the land?
No. It also excludes demolition, site work, utility connections, permits and impact fees, and design and engineering.
Does the same per-square-foot rate apply to an ADU or an addition?
No. ADUs carry fixed soft costs that don't scale with size, and additions carry structural work on the existing house. Applying one rate across all of them produces badly wrong numbers.
What should I check before buying a lot to build on?
Soils and slope, utility access and street capacity, and the jurisdiction's permitting process. A geotechnical report before you commit is the highest-leverage money you can spend.

Where to go next

Written by the team at Elusive Construction, a licensed California general contractor (B #1112902) building in Santa Clara and San Mateo counties. General information about how residential construction works — not legal advice. For your specific contract, talk to an attorney.

Have a project you want priced honestly?

Book a Project Discovery Call and we'll tell you what's realistic — scope, budget and timeline — whether or not we're the right builder for it.